Wednesday, August 14, 2013

Nick Refinishes the Floor

After the day of prep work we were ready to put down the first coat of polyurethane. I vacuumed one more time and then Nick started the application. He had done this only once before, but had a complete handle on it. 
I'm not going to include pictures of all three coats, though there were noticeable differences between each of them and I did document them. He did the first Friday afternoon, which took the longest. We allowed the first coat to drive overnight then Nick completed the second by early afternoon on Saturday. We went back that night to do the final coat, finishing that sometime around midnight. This was the first trip we stayed at the house, but these two nights we had to stay at a friend's place. Sunday morning we left there, stopped by our house to see how the final coat turned out, then got on the road back to Utah.

First room: Master Bedroom. Working his way toward the door where I'm standing.
Closet done
Close up: first coat compared to sanded area
Dining area after
Dining area before for comparison
Living room finished
And before shot of the living room floor again. Incredible difference.



No comments:

Post a Comment