Kitchen Cabinet Refinishing, Part 3: Cabinet Doors and the Big Reveal

At the same time I was working on all of the drawer boxes and new drawer fronts featured in the previous kitchen post, I was going through the same motions (staining, drying, staining again, drying, polyurethane, more drying, etc.) with the 10 cabinet doors, many of which are very large. As I finished pairs of those I helped Nick hold them in the door openings to measure for hinge placement, then he attached the hardware.

Attaching door side hinge

Below is a stock photo of the type of hinge we used for the cabinet doors. This kind was required for the inset door look we were going for because it attaches entirely inside of the cabinet, remaining completely hidden. The previous cabinet doors were overly with hinges on the exterior.

These hinges are actually two separate pieces: the part that attaches to the door itself then clips to the part screwed into the interior wall of the cabinet base. To remove the doors you can simply unclip instead of unscrewing either. The hinges are even adjustable: after installation you can use two adjustment screws to move the cabinet doors slightly up or down and left or right, to easily center them within the door frames.


Only three of the doors were able to be installed right away because this inset hinge type needed to be flush to the cabinet door opening. For the remaining seven we had to build out the interior space in order to attach the hinges correctly, and there were a variety of differences in the space and how best to go about attaching the cabinets so the process wasn't always the same. We know about this going in, so we allotted for it in our installation time. This was one of Nick's contributions and he did a great job. Two of the seven built-in hinge bases shown below.

The wood will be painted the same green as cabinet interior. 

Once all the measurements were taken and each hinge piece installed, we clipped the doors into place to see how they looked. Below is Nick clipping one of the two largest doors into the cabinet base. We did this part after the stain was finished but before the polyurethane was applied, just to see how it all looked. Then I varnished the doors two at a time, taking them down and moving them to my workstation in the garage. After two coats on the front and one on the back I'd return them, re-attaching the door-side hinge pieces and clipping them back into place. Each pair took about a day because of drying time.



We added hardware as we went along. After I finished varnishing a pair of doors during the day and returned them to the kitchen, Nick would attach the cabinet door handles in the evening. We used Ikea Lansa stainless steel cabinet door handles. Nick did a fantastic job at this as well.

It looks crooked in the photo, but it's straight!

And now the first internet look at how the cabinets turned out and what the kitchen looks like now: 



And the 'before' photo again
Notice that the lower cabinet to the left of the range still doesn't have a door. The drawer above it hasn't been replaced either. This is the next step in the remodel: putting in a dishwasher. That's an update we're really looking forward to having. It's been about 4 years for me but much longer for Nick, as not many apartments in New York City have them. After the holidays we're going to have an electrician look at the space because we need to have the range outlet moved a foot or two to the right and a new outlet and breaker installed for the dishwasher. We've decided on a smaller 18" wide size, which should still be more than enough room for us and also save space.

After the dishwasher installation we can continue the renovation with ordering a countertop, removing the existing white tile backsplash, and after the countertop is installed, putting in a new backsplash. We were waiting to decide on a countertop color until seeing the cabinets entirely finished, to be able to get a better feel for the space and what would look best. All along I've been saying black would look best and after seeing how it turned out, Nick now agrees. As of right now the backsplash plan is stainless steel, but that could change if we find something we like better.

By the way, the photo below is nearly all of the garbage we generated during the remodel so far. Keeping all of the original cabinet bases made a huge difference. Instead of those going to the landfill, the only waste generated in order to reuse them were two small cans of paint stripper and newspapers used for collecting the paint/stripper remnants. I gave away all of the original cabinet doors and hardware by listing them on Craigslist's Free section, so those were reused by someone else. Add a few more sanding disks to the pile of wood below and that's about all of the trash created so far. Of course removing the countertop and backsplash will add to that considerably, because those can't really be re-used, but it's still not bad for such a significant kitchen makeover.


Wednesday, November 13, 2013

Tearing Up the Kitchen Floor

I remember this being one of the first things I did once Nick started his job and I began working full-time on the house. I have never seen such ugly flooring, which was motivation enough to get it done ASAP. It was also pretty easy.

Here's a before shot of the kitchen floor:


It was in such bad shape that it must have been the original flooring. There was evidence that it might have been covered by carpet at some point. I just can't imagine that the previous three owners just lived with it like this...


Pulling this up was pretty easy. Had to use a razor to scrape up at the edges and then pull using pliers once I had enough to hold. Once a large enough chunk was loose I could use my hands. Some areas came up more easily than others. Some in strips like below, but many areas in ripped, random chunks.



Below is the floor with all the linoleum removed. Still ugly, but much better. I also had to go over every inch and pull out small pointy broken staple pieces to prepare for laying the new tile.

Notice the mini-fridge on the right of the photo? The only appliance the house came with was the pictured range, so while we waited for our new fridge to be delivered/time spent laying the new tile/grout/sealant, we lived out of that mini-fridge. It's now in the garage and will eventually be a fully stocked drink fridge, especially once we start brewing our own beer, cider, and perry.



The tile below was my favorite after searching and we quickly agreed that it was perfect, though they weren't available in the store so we had to buy without seeing them in person:


After the floor was prepped, I measured and ordered 6 cases of the 16 x 16 size. It's called Marazzi Imperial Slate, in 'Black'. We laid the tile ourselves, but that will be another post on another day!

Wednesday, August 14, 2013

Nick Refinishes the Floor

After the day of prep work we were ready to put down the first coat of polyurethane. I vacuumed one more time and then Nick started the application. He had done this only once before, but had a complete handle on it. 
I'm not going to include pictures of all three coats, though there were noticeable differences between each of them and I did document them. He did the first Friday afternoon, which took the longest. We allowed the first coat to drive overnight then Nick completed the second by early afternoon on Saturday. We went back that night to do the final coat, finishing that sometime around midnight. This was the first trip we stayed at the house, but these two nights we had to stay at a friend's place. Sunday morning we left there, stopped by our house to see how the final coat turned out, then got on the road back to Utah.

First room: Master Bedroom. Working his way toward the door where I'm standing.
Closet done
Close up: first coat compared to sanded area
Dining area after
Dining area before for comparison
Living room finished
And before shot of the living room floor again. Incredible difference.



Floor Prep

Even with four days of painting we didn't get everything completed. The studio/guest room still needs to be painted but refinishing the floor took priority for the rest of the week. 
The floors were really dull and very worn. There were some water spots in the living room and black marks that resembled tire treads on some of the bedroom floors, which was probably transfer of some kind from carpet pads back when they were carpeted. 

Dining area before
Living room before
Nick spent Friday morning sanding the wood floor throughout the house while I used the vacuum to clear out all of the dust so he could see the areas he'd already done and where he still needed to sand. I ended up vacuuming 4 or 5 more times after he was finished in order to make sure we got all of the dust and anything else that might have been on the floor.

Nick sanding the studio/guest room
He had to spend extra time on areas like the one below, but was able to reduce these marks significantly!

Tire tread-like marks in bedrooms from carpet pad 

It took several hours of sanding, but the floors were finally ready. We had an appointment to have the fireplace inspected that afternoon, so as soon as that was over Nick started with the polyurethane. Here are photos of the living room and dining area sanded and ready to be refinished:

Living room sanded

Dining room sanded